Fabrication
1. Concreting without pumping.
2. The economical mould is removed in one piece.
3. The moulding moves, not the produced piece. This way, it is possible to produce several units a day with the same mould.
4. Easy piling in the zone for prefabricated units, which reduces the necessary storage space.
1. The pieces are lifted with the same angle as the slope, automatically guided, and joined to the other units.
2. Compared to other products, the ATAMAN armour unit weighs less and requires a crane with a smaller lifting capacity for the same operating radius.
1. It allows the construction of docks with steeper slopes, which significantly reduces the material required to build them.
2. The shape and dimensions of the ATAMAN armour unit’s holes considerably reduce the total weight of the protection layer built with them. This again allows a reduction of the quantity of supporting filter layers, with the consequent saving.